FOC Church Reconstruction items

S.NO Item Unit Required QTY Remaining QTY No. of Units
Rate / Unit (AED)
Offered
Unit
Offered
Value
Remarks
1 ART WORKS / SIMILAR (AT MAIN ENTRANCE WALL AROUND MAIN DOOR) Unit 100 1000
2 AUDIO VIDEO SYSTEM Unit 750 1000
3 BASKUDISHA LEFT THRONOSE Unit 30 1000
4 BASKUDISHA MAIN THRONOSE Unit 40 1000
5 BASKUDISHA RIGHT THRONOSE Unit 30 1000
6 CARPETS WITH UNDERLAY - HOLY PLACE Unit 80 250 Red Colour
7 CARPETS WITH UNDERLAY - MADBAHA AREA Unit 80 250 Red Colour
8 CARPETS WITH UNDERLAY - PRAYER AREA Unit 600 250 Grass Green Colour
9 CCTV SYSTEM Unit 55 1000
10 CEILING FANS (BLDC TYPE) Unit 10 750
11 CEILING WORKS (250+525=775 M2) M2 775 350
12 CENTRE CARPET - PRAYER AREA (50x1.2Mtr) Unit 60 250 "Red Colour with Side Stripes (50 Mtrs Long and 1.2 Mtrs Wide)"
13 CHANDELIERS - BIG Unit 200 1000
14 CHANDELIERS - MEDIUM Unit 140 1000
15 CHANDELIERS - SMALL Unit 80 1000
16 DECORATIVE LIGHTS ABOVE DOME Unit 49 1000
17 FURNITURE (BENCHES & CHAIRS) Unit 75 1000
18 GENERAL LIGHTING FIXTURES Unit 200 1000
19 MAIN ENTRANCE SOLID TEAK WOOD DOOR Unit 40 1000 Teak wood paneled door. One side carving, 3525 mm Height and 2200mm Width (2 leafs Door)
20 PASSENGER LIFTS Unit 295 1000
21 SIDE ENTRANCES SOLID TEAK WOOD DOORS Units 138 1000 Teak wood paneled doors. One side carving, 2400 mm Height and 1800mm Width (2 leafs Doors)
22 STAINED GLASS Unit 250 900
23 TELEPHONE / DATA SYSTEMS Unit 30 1000
24 WOODEN PANELLING WORKS (192+300=492 M2) M2 492 1000
25 WOODEN STEPS TO MADBAHA AND MEZZ FLOOR M2 109 1000
Grand Total*

For any further information or details please feel free to contact - 050 6160730